Sitework & Hauling Estimator
Quantity → Truckloads → Fleet → Production → Cost
Built for estimators, dispatchers, grading contractors and sitework teams.
STEP 1 OF 6
What quantity are you starting with?
Advanced Options
Calculated bank quantity2,083 BCY
STEP 2 OF 6
What material are you working with?
Suggested estimates only. Project-specific values should override presets.
Loose quantity to haul2,604 LCY
STEP 3 OF 6
What truck are you hauling with?
Usable calculated payload16.9 CYWeight is the limiting factor
Advanced Options
STEP 4 OF 6
How long is one complete truck cycle?
Total cycle time63 min
STEP 5 OF 6
Plan your production
Advanced Options
STEP 6 OF 6
What does the operation cost?
RESULTS
Your Sitework & Hauling Plan
Live prototype — change the fleet below and watch the operation recalculate.
Fleet status
Enter job inputs to evaluate the operation.
FLEET OPTIMIZER
Optimize Your Fleet
CURRENT FLEET10 TRUCKS
Production—LCY/day
Duration—working days
Cost / CY—estimated
Truck Utilization—estimated
Fleet comparison
| Trucks | Loads/Day | CY/Day | Duration | Cost/CY | Status |
|---|
COST ANALYSIS
Estimated Operation Cost
Truck cost—
Loading equipment—
Mobilization—
Total estimated cost—